Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
8. Operation Test
8.3.2 PV-Only Mode
This mode enables the solar energy to be generated. However, the battery charge-discharge
does not operate. A maximum of 4.6kW or less of solar energy generation power can be sent
to the LOAD and the system based on the EMS decision.
[Figure 8-6: PV generation, Sell remaining amount]
[Figure 8-7: PV generation, Buy shortage amount]
8.3.3 Battery-Discharge Mode
This mode permits of no solar energy generation. Battery discharge is only available on this
mode. Based on the EMS decision, the battery discharge power can be sent maximum 2kW
or less only to the LOAD.
[Figure 8-8: Battery discharge, Load use]
[Figure 8-9: Battery discharge, Load use, Buy shortage amount]
United Kingdom (Eng.) 05/2015. Rev1.1 61