Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
7. Entering Initial Installation Information
7.4.6 Changing the Inverter’s Output Setting
On the menu, select “Control ”and “ERM ”for the Operation Mode. Then, select “NOP ”for
the ERM Mode 1,
“BOTH ”for the ERM Mode2, and “Inverter Power Limit ”for the ERM Mode
3. And then choose either
“3.6 kW ”or “4.6 kW ”for Inverter Limit. Click the “ADD ”button
to select the product(s) that you want to apply this change to.
[Figure 7-8: ESS output setup page]
Add all the products you want to control, then click the “Control Now ”button to start
controlling them. You can check all the changes made to
“ESS Information ”(It may take
about 5 minutes to update such changes to this item).
[Figure 7-9: PCS information page]
58 United Kingdom (Eng.) 05/2015. Rev1.1