Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
7. Entering Initial Installation Information
Information Description
Owner Address
Enter the owner’s address
[Table 7-1: Registration Item list]
7.4.4 Checking the Current Status of ESS
Click the main menu and select the “ESS List." Enter the “Search ”menu. If you enter search
keywords and click the “Search ”button, the current status of ESS is displayed.
[Figure 7-5: ESS status page]
7.4.5 Changing Inverter’s Feed-In Setting
Select “Control ”on the menu, select “ERM ”for the Operation Mode, and then select
“NOP ”for the ERM Mode 1, “BOTH ”for the ERM Mode 2, and “Feed-in ”for the ERM Mode 3.
Enter your desired value in “Feed-in (%) ”and click the “ADD ”button to select the product
you want to apply this change to.