Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
7. Entering Initial Installation Information
7.4 Web Page Connection
7.4.1 Web Page Connection
Open an Internet browser of your laptop or smart phone, then enter the designated address.
Then the system information input page pops up.
Input URL: https://myess.samsungsdi.com/engineer/main.do
or
https://112.106.12.149/engineer/main.do
7.4.2 Login & “ESS List ”menu
Input your ID and password for engineers to see the list of ESS.
[Figure 7-3: Engineer log in page]
7.4.3 Adding New ESS Information
Click the main menu and select “Add New ESS. ”Enter the ESS information, installation
information, and owner's information. The data input includes the ESS UID, service date,
installation date, installer information, phone number, address, city information, national
code. These information data may differ according to the product model and product
version. Click the "Submit" button when all is completed. Then a success message appears.
Main menu
54 United Kingdom (Eng.) 05/2015. Rev1.1