Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
7. Entering Initial Installation Information
7. Entering Initial Installation
Information
You can use the following procedure to enter the initial installation information and to
monitor the operational information of this system appropriately on server.
7.1 Information Input Administrator
You have to use a laptop or a smart phone to enter the installation information.
7.2 System Information input stage
1
st
Step : Direct Connection to PC -> Input Local Setting Value
2
nd
Step : Connection to Web Page -> Input Webpage Setting Value
7.3 PC Direct Connection and Local Setting Value
7.3.1 PC Direct Connection Flow
System Off Status → Insert Jumper Wire, Connect PC LAN cable
→ System AC on → PC Direct Connection → Input Setting Value
→ System off → Remove Jumper Wire → Connect Internet LAN Cable
50 United Kingdom (Eng.) 05/2015. Rev1.1