Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
5. Electrical Connections
[Figure 5-19: PV connector (Female) and PV line (Male)]
The [Table 5-7] shows the lead wire standard for the PV. The thickness (6mm
2
) of the lead
wire is recommended for the 3.6 kWh All in One.
Area Insulation Color code
PE 6mm
2
600V or more Green with yellow lines
PV (+), (-) 6mm
2
700V or more Black
[Table 5-7: Wire Standard]
After opening the side cover, perform the PV and AC connection. (Refer to the contents
below). Disassemble the screw to open the side cover.
[Figure 5-20: Side cover opening]
The Male product is connected to the lead wire coming from the distribution box in the PV
side, and the Female part is attached to the All in One system. The two products are properly
docked when connected together. After opening the side cover, perform the PV and AC
connection.
38 United Kingdom (Eng.) 05/2015. Rev1.1