Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
5. Electrical Connections
5.6 Closing the Front Case Cover
NOTICE
The LCD connector and ground are connected between the top left of the
front cover and the main body. Be careful when you detach the front cover.
Make sure to connect the connector and ground before reassembling the
front cover.
1. Hold the front case cover with both hands.
[Figure 5-13: Front Cover Assembly process 1]
2. Hang the product cover on the upper surface of the enclosure, then push the product
cover forward to close it.
32 United Kingdom (Eng.) 05/2015. Rev1.1