Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
5. Electrical Connections
4. With the main body laid down, make sure to have at least two persons hold the tray and
lit it up. As shown in the [Figure 5-9], the battery module must be docked to ensure that
the end guide faces the leg of the exterior case of the main body.
When docking the battery, make sure not to have the battery cable caught on the
battery frame. After docking the battery, fasten the screws to fix the tray and the main
body. Make sure to have two persons lift the battery tray.
Use a torque screwdriver of 1.2-1.8N
∙m to tighten the screws on the battery tray.
[Figure 5-9: Battery Docking description]
United Kingdom (Eng.) 05/2015. Rev1.1 29