Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
5. Electrical Connections
5.4 Battery Installation
1. As described in Subsection 5.2, remove the front case and lay the main body of the
system on a flat surface with the inside rear view faced upward. When you lay down the
system, make sure to have at least two persons work together for safety.
[Figure 5-6: Rear Inside View]
2. Prepare the battery tray to dock the battery on the main body and have at least the two
persons work together because the battery weighs much. The [Figure 5-7] shows the
battery tray seen from the enclosure. The knobs are located on the battery tray plate,
and the battery is located on the opposite side of the knob enclosure.
[Figure 5-7: Battery Tray Rear View]
3. As seen in the [Figure 5-8] of the battery tray, the output cable is connected with the
connector, and four BMS and the signal cables come out from the battery module.
[Figure 5-8: Battery Connection]
28 United Kingdom (Eng.) 05/2015. Rev1.1