Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
5. Electrical Connections
5.2 Opening the Front Case Cover
NOTICE
The LCD connector and ground are connected between the top left of the
front cover and the main body. Be careful when you detach the front cover.
Make sure to connect the connector and ground before reassembling the
front cover.
As shown in the [Table 5-3], 3.6 kWh All In One is delivered with the blue front case cover
attached. Remove the front case cover for electrical connections.
Front View
Turn the screws (A, B, C, and D)
counterclockwise to assemble.
Side View
1. Pull the lower end turning 15 degree
upwards.
2. Push upward separate the front case
cover from the upper ring.
[Table 5-3: Front Case Open Process]
26 United Kingdom (Eng.) 05/2015. Rev1.1