Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
4. Installation
1. Select the drill proper for specifications for drilling specifications.
2. Remove the dust from the hole, then separate the nut and the washer to insert both the
bolt and the cap.
3. Set the product in place, assemble the washer and the nut to the bolt, and then use the
spanner to fasten the nut (7N∙m).
Required tools for installation
[Figure 4-6: A Flat head driver for the front cover knob (larger than 10mm)]
[Figure 4-7: The Plus head driver (No.2) for the tray, the side cover, and grounding]
[Figure 4-8: A spanner for fastening use]
18 United Kingdom (Eng.) 05/2015. Rev1.1