Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
4. Installation
4.2 Mounting Instructions
[Figure 4-4: Spanner for fastening anchor nuts]
[Figure 4-5: Anchor Bolt]
Screw
name
L S D L1
Drill
Used
Drill
depth
(Min.)
Tensile
capacity
(Max.)
Shear
Capacity
(Max.)
1/2 (M12) 100 60 17 50 17 55 (mm) 3,200 (kgf ) 3,400 (kgf )
[Table 4-2: Specifications for anchor bolt]
United Kingdom (Eng.) 05/2015. Rev1.1 17