Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
4. Installation
4.1.1 Dimensions and Weight
Once the 3.6 kWh All In One system has been assembled, its dimension is 1000 x 680 x
267mm, and its weight is approximately 95kg. The [Figure 4-1] and [Table 4-1] show the
outer dimensions and the weight of the device after assembly, respectively.
[Figure 4-1: Dimension of All in One]
Battery Inverter ( Include case) Total
Weight 45kg 50kg 95kg
[Table 4-1: Weight of All in One]
4.1.2 Ambient Conditions and Temperatures
Identify a proper installation location to install and remove the device easily at any time.
This device must be located within reach distance.
The ambient temperature of the installation location will range from -10°C to +40°C.
4.1.3 Minimum Clearance
This device is required to maintain a minimum clearance distance for the safe installation of
the product. Refer to the [Figure 4-2] to secure enough space and keep a distance of 0.1m
from the wall, 1m in the front of the device, 1m and 0.3m on each side, and 0.3m on top.