Installation Manual
Table Of Contents
- Table of Contents
- Table of Tables
- Table of Figures
- 1. About this Manual
- 2. Safety
- 3. Package Removal and Inspection
- 4. Installation
- 5. Electrical Connections
- 5.1 The Overview of Electrical Connection
- 5.2 Opening the Front Case Cover
- 5.3 The Overview of the Connection Area
- 5.4 Battery Installation
- 5.5 Inner Wiring Connection (Power and Signal Wire Connection for BMS)
- 5.6 Closing the Front Case Cover
- 5.7 A Method of Locking the Distribution Box (Board)
- 5.8 An Installation Method of Energy Meter Electrical Connection
- 5.9 A Connecting Method of the DC Line from the PV
- 6. Communication Connection
- 7. Entering Initial Installation Information
- 7.1 Information Input Administrator
- 7.2 System Information input stage
- 7.3 PC Direct Connection and Local Setting Value
- 7.4 Web Page Connection
- 8. Operation Test
- 9. Problem Confirmation
- 10. Maintenance
- 11. Technical Specifications
- 12. Disassembly
- 13. Contact
3. Package Removal and Inspection
3.1.3 Checking Components on the Packing List
Once the product has been delivered, refer to the figure [Figure 3-3] and [Table 3-1], identify
the entire components included in the package and the correct number of the quantity
listed in the table.
Packing List
[Figure 3-3: Packing List]
Object
Part Name Code No. Quantity
A INVERTER ASSY SJ94-00108B 1
B TRAY ASSY (2
nd
Module) ELPT362-00002 1
C 1. SCREW(M4xL16)
2. EXTENTION WIRE
3. EXTENTION WIRE (*)
4. EXTENTION WIRE
5. CABLE TIE (A: Long, B: Short)
6. JUMPER WIRE
SJ81-01146
3901-000819
3901-000820
3901-000821
-
3901-000859
10
1
1
1
2
1
D Installation Quick Guide
Manual
SJ68-02069B 1
(*): 3. EXTENTION WIRE may not be needed depending on the type of battery tray
[Table 3-1: Component Description]
10 United Kingdom (Eng.) 05/2015. Rev1.1