Operating Manual
Installation, assembly and commissioning for
the first time
Version 1.1 Page 62 of 92
4.12 Work step sequence to commission the batteries
Execute the following steps to commission a system comprising ESS batteries connected in parallel.
Figure 4-27: representation of the work sequence to commission a BMZ ESS battery