User`s manual
5-4
From the previous page
3) Fit wiring duct
- Prepare the retention screws locally.
- Use a wiring duct to enable easy external wiring for the I/O / special I/O / option / device net
/ I/O link module of the JW300. By installing a mounting base and increasing the wiring duct
height to the same level as the JW300, it will be easier to install the cables and make the
necessary connections.
4) Set the rack no. switch of expansion rack panel.
- See page 4-11 to 13 for setting a rack no. switch.
5) Install JW300 system configurating modules to basic/expansion rack panel.
- See page 5-5 to 9 for installation of each module (power supply module, control module,
etc.)
6) Connect I/O expansion cable to basic/expansion rack panel or I/O bus expansion adapter.
- I/O expansion cable is to receive signals of each rack panels. Be sure that the total length of
the cable does not exceed 14 m (50 m when using an I/O bus expansion adapter).
See page 6-14 to 15 for connecting the I/O expansion cable.
7) Fit partition plate when installing basic/expansion rack panel to control panel.
- Prepare the retention screws locally.
8) Ground the partition plate securely after installation.