SOLAR POWER CONDITIONER Service Manual
JH-1600E Released in May 2009 Version: V00 TABLE OF CONTENTS Important Service Safety Precautions…………………………………………… 2 Warning…………………………………………………………………………….. 3 General Information……………………………………………………………….. 5 1 System Overview.................................................................................................................................. 5 2 Overview of Solar Power Conditioner ..............................................................................
Important Service Safety Precautions This manual contains important safety instructions for JH-16000 E that shall be followed during the installation of the solar power conditioner. To reduce the risk of electrical shock, and to ensure the safe installation and operation of the solar power conditioner, the following words appear throughout this manual to inform you or alert you something may cause dangerous situation or safety instructions must be followed.
WARNING These servicing instructions are for user by qualified personnel only. To reduce the risk of electrical shock, do not perform any servicing other than that specified in the operating instructions unless you are qualified to do so. Be sure to use appropriate service parts listed in the replacement parts list and tools when you repair the solar power conditioner. Never alter the solar power conditioner as it may cause an electrical shock, heat or fire.
Cables should not be damaged or assembled. Do not use cables or lead wires with scar or deteriorated ones. Replace them with appropriate one immediately. Otherwise, it may cause an electrical shock or fire. Be sure to confirm the location applied for a part, wiring, soldering or the connection status of crimping terminal, are all appropriate. Otherwise, it may cause heat, fire or an electrical shock.
General Information 1. System overview Item Function Description 1 PV module Convert solar energy to electric power 2 Mounting Fix the PV module on the roof with mounting structure structure. DC Wiring Connect PV array to DC breaker 3 cable Remark PV: photovoltaic PV array: A number of PV modules connected together in a single mounting structure 4 DC breaker Isolate the PV array from solar power conditioner.
2. Overview of solar power conditioner Unit: mm Fig1.
Unit: mm Fig2. Dimension of bracket Fig3.
Table1.
3. Solar power conditioner specifications Model JH-1600E Maximum system voltage 350 V Rating input voltage (DC) 240 V Range of operating DC voltage(DC) 60~320 V Maximum array short circuit current(DC) 10A Maximum operating current(DC) 8.5A Nominal output voltage(AC) 230 V Operating voltage range(AC) 210 – 255 V Nominal output frequency(AC) 50 Hz Operating frequency range(AC) 47 – 53 Hz Maximum continuous output current(AC) 7.
Analyzing Defect Situation 1. Analyzing Defect Situation I. Checking serial number Check and record the serial number of the solar power conditioner (You can find it in the rating label located at right side of the unit). Representation of serial number: A. Last number of Production Year. B. Month (0 ~ 9, X, Y, Z) C. Factory: 7 for DELTA China WJ factory D. Consecutive number (5 digits) a b c d II.
Installing the conditioner in the place mentioned above may cause the malfunction of the system caused by water or high temperature inside the solar power conditioner. III. Checking accumulated power A. Check whether the solar power conditioner is in either of the following conditions. The solar power conditioner is powered on (Indicator is displayed on the solar power conditioner display). The solar power conditioner is not powered, but connected to the utility. B. Press SELECT button.
2. Checking PV Power System Flow Chart Before checking the solar power conditioner, confirm that the following setting and connections of the PV power system: 1. DC disconnect 2. PV string 3. AC disconnect 4.
3. Checking and Changing Parameter of Operating Condition Purpose: If need to adjust the parameter (voltage / frequency protection level, disconnecting / reconnecting time setting, product ID) of solar power conditioner to meet the local application, follow below procedures to check and change parameters of solar power conditioner. 1. Turn on the PV string. 2. Take off the cover of wiring box 3. Press “ENT” button for 5 second to display “OFF”. 4.
Setting parameter flow chart Please refer to the Error/Fault code Push 'ENT' for 5 seconds SEL MPPT mode ENT Error List Fault mode Night time mode SEL Standby mode ENT SEL ENT SEL ENT SEL ENT SEL ENT SEL ENT SEL ENT SEL ENT ENT ENT Day Power List ENT ENT ENT ENT Changed ENT ENT SEL Parameters Setting SEL SEL ENT SEL SEL Please refer to the software Setting ● SEL SEL ● SEL ● SEL SEL ● SEL ● SEL ● SEL ● ENT SEL SEL 14 Reset Error List ENT
List of Parameters for Operating Condition Function explanation: 1. Utility over voltage (Vac): Setting utility over voltage trigger value. 2. Utility under voltage (Vac): Setting utility under voltage trigger value. 3. Voltage abnormal trip time (sec): Setting trip time when over and under voltage protection is triggered. 4. Utility over frequency (Hz): Setting utility over frequency trigger value. 5. Utility under frequency (Hz): Setting utility under frequency trigger value. 6. Freq.
4. Clearing Error 4.1 Clearing error code list inside the unit Step1: Press ENT button for 5 seconds. “OFF” is displayed. Step2: Press SEL button the display panel show “EL”. Step3: Press SEL button the display panel show “dAY-P”. Step4: Press SEL button the display panel show “PS”. Step5: Press SEL button the display panel show “d-rSL”. Step6: Press ENT button the display panel show “r_EL”.Press ENT button repeat step5 and step6 can reset error list. Step7: Press SEL button the display panel show “r_IP”.
5. Error Code and Service Recovery method explanation: I. Recovery method A: Auto-restart after default reconnecting time. II. Recovery method B: Auto-restart after waiting 10 sec. III. Recovery method C: Auto-restart after waiting 10 sec. But enter recovery method D when error four times (show d-XX error code.) IV. Recovery method D: Turn on solar power conditioner by hand after repaired.
Check The solar power conditioner is in normal status. Action Wait until the utility grid recovers. The solar power conditioner will restart automatically. Cause AC breaker is shut down. Case.2 Check Check the status of the AC breaker. Action Turn on the AC beaker. The utility grid is received and the solar power conditioner will restart automatically. Cause Voltage of the utility grid falls due to the electric supply status of the power company.
Check If the error message “F-02” appears frequently after restarting the solar power conditioner, the frequency detecting circuit on the control circuit is in abnormal condition. Action Replace a new solar power conditioner. Error code F-03 Recovery method : A Description Utility frequency under setting value Protection level Less 47Hz [Parametr:46Hz / 47Hz / 48Hz] Activation time 1 sec(default value) [Parametr:1S / 1.4S / 1.8S] Case.1 Cause Power failure of the utility grid.
Protection level --- Activation time --- Case.1 Cause Power failure of the utility grid. Check The solar power conditioner is in normal status. Action Wait until the utility grid recovers. The solar power conditioner will restart automatically. Case.2 Cause The solar power conditioner stops unnecessary. Check Confirm that the solar power conditioner restarts, and check the status when F-07 occurs. Action If F-07 occurs frequently, replace a new solar power conditioner.
Error code P-11 Description PV array over voltage Protection level More than 320VDC Activation time Recovery method : B 200 mS Case.1 Cause Input voltage of the solar power conditioner exceeds the limited value. Check Check the voltage of all input terminal of the solar power conditioner. Action (1) If the input voltage is large than 350V. --The solar power conditioner is in normal condition.
Error code E-16 (d-16) Description Communication error. Protection level --- Activation time --- Recovery method : C Case.1 Cause Noise interference Check Confirm that the AC and PV terminal noise. If the noise is large beyond acceptable. Turn off solar power conditioner immediately. Restart solar power conditioner after noise is disappearance. Action --- Case.2 Cause The solar power conditioner display cable is disconnected.
Action Replace a new solar power conditioner. Error code E-18 Description Ground fault. Protection level --- Activation time --- Recovery method : B Case.1 Cause PV array grounding fail. Check Confirm PV array resistance between the PV + / - and GND. If the resistance is lower 640Kohm, ask dealer to check PV array. Action --- Case.2 Cause Grounding test circuits fail. Check Confirm resistance between PV + / - terminal and GND in wiring box of solar power conditioner.
Activation time 300ms Case.1 Cause Bad utility waveform Check Check the waveform of the utility. Action Avoid the interference on the utility waveform. Case.2 Cause Defect of the solar power conditioner. Check If the error message “E-21” appears frequently after restart the solar power conditioner, the solar power conditioner is in abnormal condition. If this error occurs four times successively, “d-21” is displayed and the solar power conditioner stops. Action Replace a new solar power conditioner.
Activation time --- Case.1 Cause Ambient over spec. Check Measure the ambient, if over 60C than solar power conditioner stops. Action Waiting for ambient decrease. Case.2 Cause The solar power conditioner is located in inappropriate location. Check Obstruction around the solar power conditioner may cover the enclosure of solar power conditioner for admission/evacuation. Action Remove the obstruction. Case.3 Cause The temperature of fin is over spec. (see above “protection level” item for detail.
Error code E-27(D-27) Description Relay open Protection level --- Activation time --- Recovery method : C Case.1 Cause Relay is damage. Check If the error message “E-27” appears frequently after restart the solar power conditioner, the solar power conditioner is in abnormal condition. If this error occurs four times successively, “d-27” is displayed and the solar power conditioner stops. Action Replace a new solar power conditioner. Case.2 Cause Relay detector circuit is abnormal.
Description EEPROM abnormal. Protection level -- Activation time -- Case.1 Cause EEPROM failed. Check If the error message “D-40” appears frequently after confirming the PV array voltage. The solar power conditioner is damaged. Action Replace a new display board.
Replacing Fuse 1. Detaching Wiring Box I. If you have to detaching wiring box, be sure to turn off AC and DC input breaker for the solar power conditioner in advance. Otherwise, it may cause an electrical shock. II. Confirm the DC and AC power are turned off, and remove four screws located on the wiring box cover and take off the wiring box cover. 2. Checking DC Fuse I. Perform “1. Detaching Wiring Box”, and remove the wiring box cover of the conditioner. II.
4. Replacing AC or DC Fuse I. Perform “1. Detaching Wiring Box”, and remove the wiring box cover of the conditioner. II. Remove the AC fuse from the holder. III. Remove the DC fuse from the holder. IV. Insert a new AC fuse (FUW2) into the holder. (little fuse : 20A/250V) V. Insert a new DC fuse (FUW1) into the holder.
Replacing Unit 1. Detaching Wiring Box I. If you have to detaching wiring box, be sure to turn off AC and DC input breaker for the solar power conditioner in advance. Otherwise, it may cause an electrical shock. II. Confirm the DC and AC power are turned off, and remove four screws located on the wiring box cover and take off the wiring box cover. 2. Remove AC / DC and Communication cables I. Perform “1. Detaching Wiring Box”, and detach the all cables connected to the solar power conditioner.
4.
Checking System Condition after Service 1. Checking DC input I. Confirm that DC and AC power breaker are turned off. If they are turned on, turn off them. II. Remove the wiring box cover of the solar power conditioner. III. Measure the voltage of PV string on the input side of the DC breaker. If the PV voltage is more than 70V, turn on the DC breaker. If the PV voltage is less than 70V, check the PV modules DC breaker, and DC cable. IV.
Circuit and electrical block diagram Item Function 1 DC EMI 2 Boost 3 Full bridge Description To prevent conduction noise out from DC cable. To regular DC voltage for inverter stage. Using four MOSFETs as switch to inverter DC voltage to AC voltage. 4 Driver board 5 Spike killer Generator driver signal of full bridge for MOSFETs. To kill the spike voltage of inverter diodes for protection purpose.
Replacement Parts List Item Parts Code Description Quantity (1) 9NK0813221802 AC fuse 1 (2) 9NK0891040102 DC fuse 1 (3) 9NK3071538194 Terminal block(DC) 1 (4) 9NK3071539594 Terminal block(AC) 1 (5) 9NK3262043000 Shock Hazard warning label 1 (6) 9NK3470343100 AC/DC Gland 2 (7) 9NK3470343200 RJ45 Gland 2 (8) 9NK3312387700 Wiring box front cover 1 (9) 9NK3263048200 Label for wiring box front cover (upper side) 1 34
Item Parts Code Description Quantity (10) 9NK3103381000 Screw for wiring box front cover 4 (11) 9NK3105299000 Screw for main body 38 (12) 9NK3263876000 Rating label 1 (13) 9NK3262043100 Burn Hazard warning label 1 35
Item Parts Code Description Quantity (101) (102) 9NK35136666XX Carton 511*445*295mm 1 9NK35188380XX Bottom end block EPE 1 (103) 9NK35009554XX Bag PE 1 (104) 9NK35188379XX Top end block EPE 1 Item Parts Code Description Quantity (105) (106) 9NK33123936XX Wall mounting bracket 1 9NK31033810XX Screw M#6-32*10 (Fix unit to the bracket) 2 (107) 9NK31090374XX Screw ψ5.5*1.
Packing instruction 37
38