Service manual
Step Part No.
3
3-4
SP2 x 2.5
3·5
SP2 x 2.5
4 2·5
4-6
SP2 x 2.5
5 2·2
RE1.5
2-3
RE1.5
Component Explanation
Paper holder installing plate (left) The paper holder installing plate (right) unit serves
as
a
unit
fixer of
the
bearing or the platen roller
unit
(3·3), too.
Phillips round head
screws (2)
Paper holder installing plate
(right)
unit
Phillips round head
screws (2)
Pulley support rest (left) unit
Stopper
Phillips round head screw
Idler gear
Retaining ring
(E
type)
Pulley gear
unit
Retaining ring
IE
type)
-
76
-
Set it with the parallel part of the bearing up.
The screw·tightening torque
is
2.5
kg
/em.
After tightening the screws, hook
the
paper holder
spring onto the hook
of
the paper guide A of the frame
(1·'
).
Press the pulley support rest (left) unit (2·5) into the
frame
(1·1).
The screw· tightening torque
is
2.5 kg/em.
Set the pulley gear
unit
(2-3)
to
shift into double-gear
with
the cog.
(Mark
the
cog first.)
2·2