Technical data

Rev.February 1996 Conti-Dryer Page 24
CD 25-600
5.2.3 Assembly of conveyor Con-Evator PGT (11).
The conveyor Con-Evator PGT will automatically keep the drying hopper full, thus
creating an even ow of material in the drying hopper, corresponding to the material
consumption in the production.
Assembly, see section 4.1.2
5.2.4 Level control + alarm lamp (38a) (38b)
The machine is not factory prepared for this accessory which must be tted by an
authorized Labotek technician.
Please note that an alarm lamp (38b), giving signal at missing material condition, is
available for the vacuum conveyor type Con-Evator.
5.2.5 Assembly xture for Mini Master-Batcher (39)
This xture applies when it is required to dose directly into the Conti-Dryer using
Labotek’s chamber dosing unit MMB. Dosing problems may occur, as the pressure in the
Conti-Dryer may go out through the mounting base and up through to the hose to the
MMB. A special pressure compensation kit is available from Labotek in such case.
1. It is a condition that a mounting base (26) is assembled between CD and production
machine.
2. Fit assembly xture (39) on pipe chassis (93).
3. Fit using two clips (91) hose (90) between assembly
xture (39) and outlet pipe (92).
5. Disassemble plug in inlet
branch of mounting base by
loosening the screw retaining
it. Put the outlet pipe (92)
down in the mounting base
(26).
6. Assemble MMB on assembly
xture and connect according
to diagram.
R1640