Operating instructions

Operating Instructions Chapter 11
C4000 Standard/Advanced
8009861/WA65/2012-06-12 © SICK AG • Industrial Safety Systems • Germany • All rights reserved 75
Subject to change without notice
Technical specifications
Minimum Typical Maximum
Receiver unit
Switching outputs (OSSDs) 2 PNP semiconductor, short-circuit protected
10)
,
cross-circuit monitored
Response time See chapter 11.3 on page 79
Switch off time 100 ms
Switch on time 2.5 × response
time (single
system)
4.5 × response
time (cascade)
Switching voltage
11)
12)
HIGH
(active, U
eff
)
U
V
2.25 V 24 V U
V
Switching voltage
11)
LOW
(inactive)
0 V0 V3.5 V
Switching current 0 mA 500 mA
Leakage current
13)
0.25 mA
Load capacity 2.2 µF
Switching sequence Depending on load inductance
Load inductance
14)
2.2 H
Test pulse data
15)
Test pulse width 120 µs 150 µs 300 µs
Test pulse rate 3
1
/s 5
1
/s 10
1
/s
Permissible line resistance
between device and load
16)
2.5
Supply lead 1
Power consumption 3 A (host/
guest/guest)
10)
Applies to the voltage range between –30 V and +30 V.
11)
As per IEC 61131C2.
12)
On the device plug.
13)
In the case of a fault (0-V cable open circuit) the max. leakage current flows in the OSSD cable. The down-
stream controller must detect this status as LOW. A FPLC (Fail-safe Programmable Logic Controller) must be
able to identify this status.
14)
The maximum rated load inductance is higher with lower switching sequence.
15)
When active, the outputs are tested cyclically (brief LOW). When selecting the downstream controllers, make
sure that the test pulses do not result in deactivation when using the above parameters.
16)
Make sure to limit the individual line core resistance to the downstream controller to this value to ensure that
a short-circuit between the outputs is safely detected. (Also note EN 60 204 Electrical Machine Equipment,
Part 1: General Requirements.)