Operator`s manual
OPERATION
Form 169000 / 169040 58 Revision C
p. Lower mower conditioner onto flatbed, so that its
weight rests on the frame and sloped edge of
header end panels, or cutterbar as shown.
q. Remove four bolts (N), and remove the lean bar
to minimize load width. Secure the lean bar to
the flatbed.
r. Tie the unit and the end of the APT down
securely.
6.8.3.2 Unloading: Pull-Type
a. Remove tie downs.
b. Install lean bar onto mower conditioner with four
bolts (N).
c. Attach a chain to each frame hook (A), and a
chain to each end of the lean bar at (B). Chain
must
pass through hole at end of lean bar.
CAUTION
Equipment used for unloading must meet or
exceed the requirements specified below.
Using inadequate equipment may result in
chain breakage, vehicle tipping or machine
damage.
Lifting Vehicle
:
Minimum Lifting Capacity: 8500 lb (3865 kg)
Minimum Lifting Height: 15 ft (4.5 m)
Chain:
Type: Overhead Lifting Quality (1/2 in)
Minimum Working Load: 5000 lb (2270 kg)
d. Position forklift from either front or back of
mower conditioner, lift “slightly off” the flatbed,
and move flatbed from beneath mower
conditioner.
e. Lower mower conditioner, and install wheel/axle
assemblies onto mower conditioner. Secure
axle to frame with bolt (C), and tighten to
required torque..
f. Lower mower conditioner to ground, and remove
lifting chains.
g. Remove tie securing steering cylinder to frame.
(continued next page)
B
A
N
C