Install Instructions

6
Making a SharkBite
®
Clamp/Barb Connection
4
3
2
1
5
Step 1. Use plastic tubing cutters to cut the tubing
to length, making sure that you have a good
square cut. A rough or uneven cut will result
in a weakened joint.
Step 2. Slide the correct size clamp ring over the
tube and approximately 2" past the end
of the tubing.
Step 3. Push the tubing onto the barbed fitting until
it touches the fitting shoulder. Position the
clamp ring 1/8"-1/4" from the end of the tube.
This distance ensures that the clamp ring is
positioned directly over the barbs on the fitting.
Step 4. Position the open jaws of the clamp tool over
the raised tabs of the clamp ring and squeeze.
One clamp tool fits all size clamp rings. It can be
operated with one hand, leaving the other hand free
to hold the clamp ring in position. The tool cannot be
removed until the clamp ring is fully compressed.
A properly calibrated clamp tool eliminates the necessity
to check each fitting ring with a go/no-go gauge.
Step 5. Verify the connection is secure by
visually checking the clamp tab.
The use of traditional PEX components (manifolds, barbed fittings, clamp
or crimp rings, etc.) offers the total lowest material cost.