Installation Guide
The flow control valves on the lower manifold should come in the closed position.
1. To open the valve, rotate the cap counter-clockwise.
2. To close the valve, rotate the cap clockwise.
*If a loop is unused, install a short length of PEX and use an end cap to close o the port.
FLOW CONTROL VALVES
7
OPEN CLOSE
10XXX










