Technical data

PHONE:
800-355-4945
WEB:
www.energyproducts.biz
EMAL:
info@energyproducts.biz
22
4. Attach the third hose (blue) to valve “C” located above
the primary circulator. Put the other end into the ll tub.
This valve “C”should be open allowing water to circulate
through the oor and all of the loops back to the bucket
where it started. The bucket must have uid in it at all times
while lling. As the water returns the uid may be milky,
this is air in the solution. The uid must be circulated until
all air is removed and the water runs clear.
5. The ball valve “D” located on the upper ange should be
closed during lling and Open when in operation.
6. If this is a primary/secondary system (2 pumps on the
main panel) the purge valve should be in the vertical
position “E” while lling. This forces the uid through the
oor, and prevents ow to the primary loop during the lling
process. After the system is lled make sure that the purge
valve “E” is open and in a horizontal position.
Note: If you have a Calef differential by-pass kit on your
manifold you need to attach the ll hose to “C” and the discharge
hose to”A’. This reverses the ow and allows you to still purge
each loop individually and not open the by pass while lling.
FILLING HOSE CONNECTIONS
IV. DOMESTIC WATER FORCED FILL
A. Domestic water forced ll procedure
1. Attach the ll hose to the domestic city water supply, attach the other end to the gate valve”A” on the
bottom ange of the primary circulator.
2. Attach the discharge hose to the gate valve “C” on the upper ange of the primary circulator. The
other end of the discharge hose should be submerged in water prior to going into a drain.
3. Fill the system, watch for air bubbles in the discharge water.
4. Open each loop individually so the air can be purged from each loop separately. Watch your tub to
see if any air bubbles are coming out of the solution while lling.
5. When no bubbles are seen, close the discharge line. When the pressure comes to 15-25 lbs, turn
off the ll valve and shut off the water.
E