User's Manual
UTT Technologies Chapter 12 Security
http://www.uttglobal.com Page 364
Figure 12-37 Schedule Settings Example
Step 2 Enter work in the Schedule Name text box.
Step 3 Enter 2011-1-1 in the Start Date, and enter 2011-12-31 in the End Date.
Step 4 Configuring the two periods of the schedule respectively.
1) Configuring Period 1: Select Weekdays (Mon-Fri) from the Days of the
Week drop-down list, enter 09:00:00 in the Daily Start Time, and enter
11:59:59 in the Daily End Time.
2) Configuring Period 2: Select Weekdays (Mon-Fri) from the Days of the
Week drop-down list, enter 13:00:00 in the Daily Start Time, and enter
17:59:59 in the Daily End Time.
Step 5 Click the Save button to save the settings. Till now you have finished
configuring the schedule of work, and then you can reference it in an access
control rule. Please refer to section 12.3.5.1 for detailed operation.