Installation Instruction
NAKe Series Non-contact Level Switch Installation Instruction
SHANGHAI HUIBO AUTOMATIC GAUGE CO., LTD
Address: Room 1611, Lijing Yangguang Building, NO.19 Wuning Road,
Shanghai,China
Web Site:www.china-huibo.cn Email: huiboshanghai@163.com
①、Alarm level of Ash level in the container
②、Installation and maintenance convenience
③、Those with heating panels should avoid them.
④、Those with vibrators should avoid them
2. Common installation locations:
①、Ash hopper, economizer ash hopper, ash storehouse to the user
request the location of the alarm level;
②、The installation position of ash pump:
High alarm should be installed in the alarm point below 30-50 cm;
Low alarm should be installed above the alarm point 30-50 cm.
③、Installation position of coal cinder tank:
High alarm is installed at 100-200 cm below the alarm point;
Low alarm installed above alarm point 100-200 cm.
④、Installation position of coal bunker:
High alarm installed in the alarm point below 200-300 cm;
Low alarm installed above alarm point 200-300 cm.
III.Mounting of support and level gauge
1. Support mounting
①、Angle iron welding: