User Manual
SWH - Grain Condition Monitoring Device - Installation
and configuration Manual
5/(10)
Prod. #
Doc. #
Rev
Date
Author
010102
03
C
02/09/2022
SMV
SGS - IOT COMPETENCE CENTER
This document and information contained in it are confidential and are the property of Société Générale de Surveillance (SGS) . They may not in any
way be disclosed, copied, or used by anyone except as expressly authorized by SGS. The document should always be kept in a secure place and
should be destroyed or returned to SGS when it is no longer needed.
2.2 CONFIGURATION
The device is already configured so it is not need it to carry out the configuration. For further information, please check
section 4 of the manual.
3 LORAWAN SENSOR INSTALLATION
In this section, the installation process of the device is explained. Before installing, please check the part list to ensure
nothing is missing.
3.1 PACKING LIST
a. Master Terminal Unit (MTU)
b. Remote Terminal Unit 1 (RTU 1)
c. Remote Terminal Unit 2 (RTU 2)
d. Remote Terminal Unit 3 (RTU 3)
3.2 EQUIPMENT INSTALLATION
In this section, the installation process of the device is explained. Please, click on the following link to see the
installation process:
TBC
The device is ready to be installed in grain warehouses. The process is as follows:
- A pipe with sensors is introduced into the grain
- The Smart Warehouse Device is located on the top of the pipe as is shown in following image