User Manual
SWH - Grain Condition Monitoring Device - Installation
and configuration Manual
4/(10)
Prod. #
Doc. #
Rev
Date
Author
010102
03
C
02/09/2022
SMV
SGS - IOT COMPETENCE CENTER
This document and information contained in it are confidential and are the property of Société Générale de Surveillance (SGS) . They may not in any
way be disclosed, copied, or used by anyone except as expressly authorized by SGS. The document should always be kept in a secure place and
should be destroyed or returned to SGS when it is no longer needed.
2 QUICK START GUIDE
The main steps are listed for quick use. Please refer to the following sections for more details.
2.1 INSTALLATION
To carry out the installation of the device, perform the following steps.
1. Checklist
Unpack the package, check the list of devices, and check whether there are any omissions.
2. Assemble the device
Connect RTUs to MTU through the waterproof connector.
3. Turn on the device
Press the power button.