Specifications
42 007-4603-001
8: Site Planning Checklist
Does your loading dock meet standard freight-carrier truck
requirements? If not, have you allocated a forklift for delivery?
Contact your site planning representative if you have concerns about
your loading dock.
Is a pallet jack available on-site to move the system in its shipping
container to the final system location?
Do the pallet-jack fork dimensions meet the requirements for the
shipping container?
Are the elevator and elevator door dimensions adequate?
Is the elevator weight capacity adequate?
Does each ramp in the access route have an incline that is less than 10
degrees?
Did you order the power receptacles for your system?
Are the circuit breakers for all cabinets properly installed and
labeled?
Are all power receptacles properly installed and labeled?
Are the floor cutouts properly positioned and free of sharp edges?
Are the recommended perforated floor panels properly positioned?
Is the computer room floor strong enough to support the weight of the
system?
Can the computer room environment be properly maintained within
the specifications listed in Table 6-1?
Are telephone lines installed if you plan to implement remote support
for your system?
Have you trained system administrators or enrolled operators in the
necessary training courses?
Table 8-1 (continued) Site Planning Checklist
Yes No Planning Issue Comments