Specifications

007-4603-001 41
Chapter 8
8. Site Planning Checklist
Table 8-1 provides a site planning checklist that you can use as an organizational tool
during the site planning and preparation process. During the planning process, you might
discover additional preparation issues at your site that this checklist does not address. To
discuss your site plans and to resolve any issues, contact an SGI site planning
representative by one of the methods listed in the summary of this document.
Table 8-1 Site Planning Checklist
Yes No Planning Issue Comments
Have you determined the system configuration?
Configuration:______________________
Have you determined the installation date?
Date:_______________________
What is the total number of system cabinets?
Have you established the system location?
Does the equipment floor layout meet the equipment maintenance
access requirements?
Is the equipment positioned so that the exhaust air of one
heat-ejecting device does not enter the air inlet of another?
Have you identified an access route to the final system location?
Does the access route meet the access requirements for the system?
Does the access route meet the floor-loading requirements for the
system?
Have you made provisions to cover irregular or engraved floor
patterns along the access route to reduce vibration of the system
while moving it?
Is assistance available to help unload, unpack, and move the system
during delivery?