Specifications

178
Chapter 5: Installing and Removing XIO Graphics and Option Boards
Powering On the OCTANE Workstation
Figure 5-44 Powering On the OCTANE Workstation
1. Plug the power cord into an electrical outlet. (Step A)
2. Push the power button on the front of the OCTANE workstation. (Step B)
3. Push the power switch on your monitor. (Step C)
Verifying the Graphics or Option Board Installation
You can verify your graphics or option board installation by using the hinv command.
To verify that your graphics or option boards are recognized, follow these instructions:
1. From the Toolchest > Desktop, open a UNIX shell.
2. At the prompt, type: hinv.
Power button
Power cord
Power switch
A
B
C