Setup guide
10 007-5922-001
2: ISS3124-RP2 Server and IS2224 JBOD NAS System Hardware Installation
• Has the Tiltwatch indicator been removed?
• After removing the packaging, is there any visible damage?
2. Record any issues/problems (if applicable):
• Use the bill of lading to record any issues discovered during the inspection.
• Sign for the shipment after making notes on the bill of lading.
3. Report the issues to SGI:
Contact the SGI Customer Support Center (CSC) at 1-800-800-4744 (in the United States; refer
to http://www.sgi.com/support/supportcenters.html
for international numbers) to begin the
replacement process. Take photos of any damage and in your message, please send a brief
description of the problem to ships@sgi.com
. A coordinator will contact you about the problem.
Prepare for Setup
Read the Warnings and Precautions section in its entirety before you begin the installation
procedure.
Choose a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door completely (~25
inches) and approximately 30 inches of clearance in the back of the rack to allow for sufficient
airflow and ease in servicing.
Warnings and Precautions
Warning: When lifting any of the NAS enclosures, two people (one at each end) should lift
slowly with feet spread apart to distribute the weight. Always follow safe lifting practices
when moving heavy objects, failure to do so may result in serious injury. More information
on moving large objects, requiring a two-person team, is available in the Centers for Disease
Control’s, “Ergonomic Guidelines for Manual Material Handling”
(http://www.cdc.gov/niosh/docs/2007-131/pdfs/2007-131.pdf)
!