Setup guide
28 007-5923-001
2: ISS3112-RP2 Server, MIS JBOD and IS2224 JBOD NAS System Hardware Installation
Figure 2-10 Slide the Alignment Tool from Front to Back
6. When satisfied, remove the alignment tool from the rack.
Installing the Air Ducts
1. Place the left air duct above the left rail, see Figure 2-11 on page 29 for an example.
2. Using its mounting screws, attach the air duct to the rack.
Note: Some air ducts use a Velcro strip in place of a second screw. If this is the case, place the
hook side of the Velcro on the air duct tab, and the fuzzy size of the Velcro on the outside of the
outer rail.
3. Repeat this for the right side.