User`s guide
SGI
®
Altix
®
XE210 User’s Guide 77
Installing and Removing the Rack Handles
Installing the Rack Handles
1. Observe the safety and ESD precautions at the beginning of this book. See “Safety
Information”.
2. Power down the server and unplug all peripheral devices and the AC power
cable(s).
3. Remove the server system cover. For instructions, see “Removing the System
Cover”.
4. Align the rack handle with the two holes on the side of the server system as shown
in the figure below.
5. Attach the rack handle to the server system with two screws as shown in the figure
below.
Figure 59. Installing the Rack Handle
6. Install the server system cover. For instructions, see “Installing the System Cover”.
7. Install the front bezel. For instructions, see “Installing the Front Bezel”.
8. Plug all peripheral devices and the AC power cable(s) into the server.
AF000377