Specifications
Table Of Contents
- SGI™ 1400 Server Family Maintenance and Upgrades Guide
- List of Figures
- List of Tables
- About This Guide
- Working Inside the System
- Tools and Supplies Needed
- Safety: Before You Remove the Access Cover
- Warnings and Cautions
- Removing the System Access Cover
- Installing the Access Cover
- Working in the Subchassis and Electronics Bay
- Installing PCI Boards
- Removing a PCI option Board
- Removing the Front Panel Board
- Installing the Front Panel Board
- Removing the Diskette Drive
- Installing the Diskette Drive
- Peripheral Drives
- System Fans
- The Power Share Board
- Upgrading Baseboard Components
- SGI 1400 Server SCSI Backplane Installation
- Technical Reference
- Baseboard Connectors
- Main Power Connector
- Auxiliary Power
- Diskette Drive
- Front Panel Connector
- The SMM Connector
- The IPMB Connector
- VGA Video Port Connector
- Keyboard and Mouse
- Parallel Port
- Serial Ports A and B
- Universal Serial Bus
- Narrow SCSI Connector
- Wide SCSI Connector
- Internal IDE Connector
- The Hard Drive LED Connector
- ISA Connector Pinouts
- The PCI Connectors
- Baseboard Jumpers
- System I/O Addresses
- Memory Map Address Range
- Interrupts
- Video Modes
- Baseboard Connectors
- Equipment Log and Configuration Worksheets
- Environmental Specifications
- Chassis Warnings and Safety
- Index

General Procedure to Close the Chassis
63
General Procedure to Close the Chassis
Follow these steps after you have finished the procedure described in the previous
sections.
1. Close the front subchassis.
2. Reinstall the front and rear foam covers.
3. Reinstall the access cover using the original screws.
4. Reinstall the existing and/or new power supplies.
5. Reconnect all AC power and peripheral device cables to the rear of the system and
to wall outlets.
6. Run the FRUSDR load utility to properly configure the system after adding new
components. See Chapter 3 of the SGI 1400 Server Family User’s Guide.