Operating instructions

Compact Operating Instructions – DOP11C
21
4
Unpacking
Installation
4.1.4 Installation diagram:
1. Connect the cables as shown to the following diagram:
2. Carefully remove the protective film from the display of the operator panel to prevent
damage from static electricity.
4.2 Unpacking
Unpack the delivery and check it. Inform your supplier immediately in the event of
damage.
8832896395
[1] Make sure that the operator panel and controller have the same electrical grounding (reference
voltage value), as otherwise there may be problems with communication.
[2] Use an M5 screw and a PE (as short as possible) with a minimum cross section of 2.5 mm
2
.
[3] Only use shielded communication cables.
Route high-voltage cables separately from signal and supply cables.
[4] The operator panel must be adjusted to the ambient temperature before it is taken into operation. If
condensation builds up, you must ensure that the operator panel is dry before connecting it to the
power supply.
Ensure that the voltage and polarity of the power source are correct.
[5] Control cabinet
Ethernet
DC 24 V
DC 24 V
Ethernet
[5]
[2][1] [4][3]
RS232 / RS422 / RS485
RS232 / RS422 / RS485
NOTICE
Place the operator panel on a stable base during installation. If the unit falls down, it
could be damaged.