Installation Guide

B. 90° Sharp Corner Sections
17
1. Cut standard spacers at 45°
2. Align spacers below block to create 90° corner.
2B
1
C. Install the first row of blocks and vertical spacers, starting with
first block in the jamb and continuing between all blocks in the
project.
D. If your project does not have a jamb on both ends, you may need
to temporarily prop a 2 x 4 stud at the open end of the wall. Make
sure the stud is plumb. This stud will serve as a plumb point for
you to follow as you set blocks.
2C
2D
2E
(test Fit the First rOw COntinued)