User guide
SerVision MVG 400 System Guide
Configuring the MVG 400 130
Figure 116: Schedules screen (inactive)
2. Select Enabled. The schedule grid and its controls are displayed.
Figure 117: Schedules enabled
The upper part of the screen contains the schedule grid. Below it are controls that allow
you to attach specific outlines to particular days and times in the grid. Below these, user-
defined holidays appear, if any are defined.
Initially, the schedule grid contains a row for each day of the week and a column for
each hour of the day. This grid defines the routine schedule for regular work weeks. Each
cell in the grid contains two colored rectangles (see figure 118 below). Each of these
rectangles represents a half hour – half of the time represented by the entire cell. The
color of the rectangle indicates which outline it represents.
Schedule
grid
User-defined
holidays
(if any)
Outline-
attachment
controls