Operator`s manual
Operation section 3 -
© 2010 Alamo Group Inc.
MOWER 04/13
OPERATION SECTION
Pre-Operation Inspection And Service
Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This includes routine main-
tenance and scheduled lubrication, inspecting that all safety devices are equipped and functional, and performing needed repairs. DO
NOT operate the unit if the pre-operation inspection reveals any condition affecting safe operation. Perform repairs and replacement
of damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided. OPS-U-0029
!
DANGER
Always disconnect the main PTO Driveline from the Tractor before performing service on the Implement. Never work
on the Implement with the tractor PTO driveline connected and running. Rotating Parts, Blades or Drivelines could turn
without warning and cause immediate entanglement, injury or death. (S3PT-11)
!
DANGER
DO NOT allow any person under a folded wing unless wing is securely locked up or supported. DO
NOT approach the Implement unless the Tractor is turned off and all motion has ceased. Never work
under the frame work, or any lifted component unless the implement is securely supported or
blocked up. A sudden or inadvertent fall by any of these components could cause serious injury or
even death. (STI-03)
!
WARNING
Periodically inspect all moving parts for wear and replace when necessary with authorized service
parts. Look for loose fasteners, wornor broken parts, and leaky or loose ttings. Make sure all pins
have cotter pins and washers. Serious injury may occur from not maintaining this machine in good
working order. (SG-21)
9