Owner Manual

1) Setting Frame and Posts:
a. Remove the base frame from the box and lay on a flat surface where the shower unit
will be installed. (See PIC 1a)* For double units make sure the center supports of both
frames are in line with each other and fasten using ¾self-tapping screws. (See PIC 1b)
It is important to determine your door location, door swing, and all wall locations
before unit installation begins.* See Floor Plan provided with installation manual.
b. Remove one set of posts from the post box and place on the frame. * The elongated
holes at the base of the post must be parallel with the shower door opening. All posts
on shower door side of unit must be installed parallel to the door opening. The post
flange will already be attached to the post. Lift flange to access where post bolts secure
to base frame WITHOUT removing flange from post.
c. Using 5/16” x ¾ stainless steel bolts (4 per post) secure post to frame by screwing in
bolts halfway. *Do NOT over tighten! Allow room to move the post slightly this is
important to be able to set the wall panels. (See PIC 1c)
d. see PIC 9a for finished product.
SINGLE UNIT BASE DOUBLE UNIT BASE WITH EXPANDER FLOOR
*Follow same process for cabana unit installation*
PIC 1a
PIC 1b
PIC 1c
Single Model Door Swing
Double Model Door Swing