Owner Manual

8) Installing the Towel Bar/Hook Bar:
a. Towel Bar: Measure 54” off finished floor and mark 2 adjacent posts (the desired
Posts on the side where the towel bar will be placed.)
Use stainless steel screws provided. (See PIC 8a.)
b. Hook bar should be installed at the same height as
The top of door hinge. (See PIC 8b)
9) Installing the Floor:
a. For a single base frame start at either edge of the frame, lay one of the pre-assembled
floor panels in place; followed by the matching interlocking panel. Note the floor planks
should run perpendicular to the frame joists. (See PIC 9a)
b. For the expander frame the floor panel with the smaller plank is to go on the side away
from the single base floor with the floor planks perpendicular to the frame joists. Install
the remaining floor panel in the open space next to the single base floor frame.
10) Install the Post Caps:
a. Use silicone to secure post cap to the
top of each post. (See Pic 10a)
Cleaning/Maintenance:
1. It is recommended to use any multi-purpose cleaner with a soft rag and/or soft brush when
cleaning the unit walls, base frame and posts. This should be done at least three times a year.
2. Use a brush with mild cleaner to clean soap scum/mold from floor decking. If that does not work
use a power washer with a fan tip approximately 10” away from surface.
PIC 10a
PIC 8a
PIC 9a
PIC 8b
Need hook bar pic
PIC 8a