Owner Manual

6 X 6 Base
**6 x 6 frames should be 1” smaller on all 4 sides of unit**
Double Unit 6x6 Base: (There will be approximately a 1” overhang of shower on 6x6 Base)
10 qty. - 5” x 3/8” Galvanized lag bolts
2 qty. 34” or 44” Pressure Treated Wood (Depending on size of unit)
2 qty. 66” or 86” Pressure Treated Wood (Depending on size of unit)
Single Unit 6x6 Base: (There will be approximately 1” overhang of shower on 6x6 Base)
8 qty. - 5” x 3/8” Galvanized lag bolts
4 qty. - 34” or 44” Pressure Treated Wood (Depending on size of unit)
1. Create a lap joint at 5 ½” in length and 2 ¾” in depth on both ends of each piece of wood.
2. Overlap each cut out connection and fasten with lag bolts, LedgerLOK or deck screw.
3. Flip the frame over to ensure a smooth surface for the aluminum frame installation.
4. Dig the wood sub-frame into the ground and make sure it is level and stable around the
perimeter. Fill the interior with 3/8” stone for a French drain. * 6x6 base should be
FLUSH/LEVEL to pavers or grade.
5. PLEASE NOTE* - Unit will overhang 1” on all four sides when installing it to the wood for
future pavers or tuck stone or dirt.