User Manual

www.SereneLifeHome.com
6
ASSEMBLY INSTRUCTION
STEP 1. FRAME ASSEMBLY
Lay out all Frame Tubes (#1) and Leg Tubes (#2) as shown. Insert the Leg Tubes into the sockets of the
Frame Tubes.
NOTE:
1. All parts with the same part number are interchangeable.
2. The side with holes on the Frame tubes (#1) should be facing upwards, in the following steps.
3. While inserting Leg tubes (#2) into Frame tubes (#1), ensure the screw holes on both parts align.
STEP 2. TRAMPOLINE MAT ASSEMBLY
When attaching Springs (#3) to Jumping mat (#4), please ask another person to help you with this.
Lay out the Jumping Mat (#4) inside the frame. The surface of the mat is smoother than the other side.
To make sure the tension on the mat balanced, please follow the instructions below to attach the springs.
Select an arbitrary point on Frame Tube (#1) and designate it as point 1. To hook the rst Spring (#3),
attach one end to the triangle ring sewn on the Jumping Mat (#4) and the other end to point 1 on
Frame tube (#1) with Spring Loading Tool (#19).