Product Manual

Personal Ambulatory Oxygen System Provider Technical Manual
39
ANNUAL MAINTENANCE PROCEDURES
The following section lists procedures that are necessary to maintain the Eclipse. Service should only be performed by a
qualied technician. To perform periodic maintenance, the only tools that should be necessary are:
#1 Phillips Screwdriver
Wire-cutting pliers
Small cable ties
ESD Mat or approved ESD system
Figure 11: Maintenance Tools.
REMOVING THE UNIT COVER
1. Disconnect power supplies and remove Power Cartridge before removing the unit cover.
2. Place the unit horizontally on the front cover.
3. Using a Phillips #1 screwdriver, remove a total of 10 screws (M3x12 Pan Head SEM Screw,
P/N 6974-312-SEQ) from the back of the unit.
• Keep hands out of moving parts
• Disconnect power supplies and remove Power Cartridge before
removing the unit cover.
• ESDSafetyproceduremustbeinplace.
WARNING: