Instruction manual

Page 14 Leica EM CPD030 Operating Manual 09/09
4.3 Installation
Required space for setting up the unit: width 490 mm, depth 660 mm.
To allow adequate intake of cooling air required for the refrigeration unit and due to
the inflexibility of the high pressure gas hose, the wall distance has to be at least
150 mm.
Connection of CO2 Container
For a correct implementation of critical point drying it is absolutely necessary to use
a pressurized gas container with a pipe (feed pipe), so that the medium (CO2) can
reach the specimen pressure chamber in liquid form.
In order to prevent accidents the CO2-pressurized gas container must be
securely fastened in an upright position.
Insert the porous filter into the lamp extractor.
Screw the porous filter into the MEDIUM IN connection, if this has already not been
done by the manufacturer.