User Manual
Table Of Contents
- Contents
- 1 About This Getting Started Guide
- 2 Unpacking the ZoneFlex Access Point
- 3 Before You Begin
- 4 Configuring the Access Point
- Configuring for Management by ZoneDirector
- Configuring for Standalone Operation or for Management by FlexMaster
- What You Will Need
- Step 1: Prepare the Administrative Computer
- Step 2: Connect the Access Point to the Administrative Computer
- Step 3: Log Into the Access Point’s Web Interface
- Step 4: Configure the Wireless Settings
- Step 5: Disconnect the Access Point from the Administrative Computer
- Step 6: Restore the Administrative Computer’s Network Settings
- 5 Verifying Access Point Operation
- 6 Deploying the Access Point
- 7 Attaching the Mounting Brackets
- 8 Mounting the Access Point
- 9 (Optional) Mounting and Connecting the External Antennas
- 10 What to Do Next
17
Configuring the Access Point
Configuring for Management by ZoneDirector
2. Feed the end of the DC cable through the boot, cable clamp housing, and coupling
ring (in the same order). See Figure 11
.
Figure 11. DC cable connector assembly
3. Strip the DC cable for about 3/8” and each of the four conductors for about 7/32”.
Figure 12. Strip the DC cable and the four conductors
4. Insert the stripped part of the conductors into the four connector pins, and then crimp
the edges of the connector pins to secure the conductors. Alternatively, use a soldering
gun to solder the conductors to the pins.
5. Insert all four connector pins into the holes on the cord connector. See Figure 30
for
the correct pinout connections.
Cable clamp
housing
Boot
Coupling
ring
DC cable
3/8 inches (max)
7/32 inches (max)