User's Manual

Table Of Contents
b. To connect the Avaya PoE injector to the WLAN AP 8120-O, see Installing the
Power over Ethernet injector on page 43.
Installing the WLAN AP 8120-O on a wall
Complete the following procedure to mount the WLAN AP 8120-O on a wall.
Procedure
1. Mark the four locations of the mounting holes on the plane bracket on to the wall.
Figure 13: Marking holes on a surface
2. Drill an 8 mm- diameter hole with a depth of 36 mm to 38 mm into each of the
markings.
English
34 Avaya WLAN 8100 Regulatory Information — WLAN
AP 8120-O February 2012
Comments? infodev@avaya.com