Installation Guide

6
September 6, 2018
Operation of radiant heat system should be set to run at 2/3 of the maximum output for a minimum of 2
weeks prior to installation of flooring to further allow moisture from concrete to dissipate and reach a final
moisture content. This must be done in both heating AND non-heating seasons.
The use of a separate thermostat for each individual zone is required. An outdoor temperature sensor is highly
recommended to adjust temperature according to anticipated heat loss.
Reduce heat to a temperature of 65° 4 days prior to installation
For direct Glue down - Turn the heat off for 24 hours before, during and an additional 24 hours after
installation. Failure to turn heat off may reduce working time of the adhesive. Follow all adhesive guidelines
set forth by adhesive manufacturer.
Floating Installation - Install flooring according to floating floor installation guidelines. We require the use of a
6mil poly-film in conjunction with underlayment. 2-in-1 underlayment’s are considered acceptable.
After 48 hours post-installation, we recommend to slowly raise the temperature of the heating system to its
preferred operating level. Please exercise caution and expect to achieve peak after a period of 5 days.
Do not allow the surface temperature to exceed 80°F with no more than a 5◦F variance in surface temperature
over a 24-hour period.
Relative humidity of the jobsite must be maintained between 35-55% relative humidity. The use of a
humidification/dehumidification system may be required to maintain the proper humidity level. Failure to
maintain proper humidity level can result in excessive dryness of flooring and void the warranty.
Seasonal expansion and contraction is expected and does not mean a defect is present within the product.
GENERAL INSTALLATION TOOLS
• Moisture Meter
• Tape Measure
• Pencil
• Chalk Line
• Hand Saw or Power Saw
• Tapping Block
• Crow Bar or Pry Bar
• Wood or Plastic Spacers (½”)
• Hammer or Rubber Mallet
FOR GLUE-DOWN INSTALLATION, YOU WILL ALSO NEED:
• Premium Wood Flooring Adhesive
Adhesive trowel (as recommended by adhesive manufacturer)
FOR NAIL DOWN/STAPLE INSTALLATION, YOU WILL ALSO NEED:
• Manual or pneumatic 16-gauge floor nailer OR 16-gauge narrow-crown stapler
• 1 ¾” to 2” 16-gauge cleats or staples
• Finish nailer and/or finish nails
• Nail set
• 15 lb. felt or asphalt impregnated Kraft paper
• Crow bar or pry bar
• Color-matching wood putty/filler