Instructions / Assembly

6
© Selecto, Inc.
INSTALLATION PROCEDURES (CONTINUED)
For Rigid Plastic Pipe Installing (steps 1 to 5 of 13):
1. Center, level, and mount the
lter head
INSTALL FILTER HEAD:
4. Connect inlet tting onto 3/4”
hard piping
2. Remove blue clip from inlet side
5. Reconnect plastic tting back to
the lter head
3. Pull and separate inlet Shut-Off
valve tting
A. Filter Head Assembly B. You can slide the heads out toward either side of
channel to separate backplate for easy installation
Tap Water
Inlet
Filtered Water
Outlet