Instructions / Assembly

6
© Selecto, Inc.
INSTALLATION PROCEDURES (CONTINUED)
For Rigid Plastic Pipe Installing (steps 1 to 5 of 13):
1. Center, level, and mount the
lter head
INSTALL FILTER HEAD:
4. Connect inlet tting onto 3/4”
hard piping
2. Remove blue clip from inlet side
5. Reconnect plastic tting back to
the lter head
3. Pull and separate inlet Shut-Off
valve tting
A. Filter Head Assembly B. You can slide the heads out toward either side of
channel to separate backplate for easy installation
Tap Water
Inlet
Filtered Water
Outlet