Instructions / Assembly

4
© Selecto, Inc.
INSTALLATION PROCEDURES
INSTALL FILTER HEAD:
For Hard Copper Pipe Installing (steps 1 to 5 of 10):
A. Filter Head Assembly
1. Center, level, and mount the
lter head
3. Pull and separate inlet Shut-Off
valve tting
2. Remove blue clip from inlet side
4. Connect inlet tting onto 3/4”
hard piping
B. You can slide the heads out toward either side of
channel to separate backplate for easy installation
5. Reconnect plastic tting back to
the lter head
Tap Water
Inlet
Filtered Water
Outlet